Daikin R-410A Service Manual page 333

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

ESIEN05-04
1.13.7 Removal of Swing Motor
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
1
Remove the screw from
the right side panel. Slide
the right side panel
toward the front and
detach it.
2
Cut off the tie-wrap of the
swing motor connector.
3
Disconnect the
connector from the swing
motor connector.
4
Remove the screw from
the swing motor. The
swing motor has two
projections on it. Lower
the swing motor and take
it out.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance
Points
When reassembling, fit the
horizontal blade shaft end to
the D-profiled bearing.
Apply the tie-wrap to the
connectors to secure them in
place.
5–93
1
3
5
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents