Daikin R-410A Service Manual page 315

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

ESIEN05-04
Step
2
Insert the lead wires of
swing flap to the
connector on the PC
board.
3
Install the cover of switch
box and the grille.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance
(S2637)
(S2636)
Points
1
3
5
5
5–75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents