Daikin R-410A Service Manual page 318

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

Disassembly and Maintenance
Step
1
3
Install the switch box and
the decoration panel.
4
Insert the lead wire of the
receiver section to
connector X1A, and bind
the two wires with tie
wrap.
5
Set the dip switches.
3
6
Mount the transmission
parts box with two screws
after checking that the tie
wrap is in the fixing
position and the lead wire
is caught with fixing part
of tie wrap and can not
come out.
7
Insert the lead wire from
the transmission parts
box to the connector
5 5
X24A on indoor unit.
Pass through the lead
wire to be connected to
X24A on the indoor unit
PC board under the
hooking piece.
5–78
Procedure
Tie wrap
Hooking piece
X24
When install the decoration
panel,
be careful not to catch the lead
wire.
(S2696)
Setting the dip switches
(S2694)
Set the dip switches with same
conditions as those of the
transmission parts box
removed.
(For details of setting, refer to
the instruction manual of
infrared remote control kit.)
(S2703)
Part 5 – Disassembly and Maintenance
ESIEN05-04
Points
(S2702)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents