Daikin R-410A Service Manual page 311

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

ESIEN05-04
Step
12
Install the switch box with
two M4 screws and one
M5 screw.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance
Points
For installation of the switch
box, refer to the "Removal of
Switch Box" on page 5-53.
For re-wiring inside the switch
box, refer to the "Replacement
of PC Board" on page 5-72.
(S2652)
1
3
5
5
5–71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents