Cisco UCS C210 Installation And Service Manual page 25

Generations m1 and m2
Hide thumbs Also See for UCS C210:
Table of Contents

Advertisement

Chapter
Figure 2-4
1
Rear of server
3
Mounting bracket
5
Installation release clip
Step 3
Insert the server into the slide rails:
This server weighs approximately 50 pounds (23 kilograms) when fully loaded with components. We
Caution
recommend that you use a minimum of two people when lifting the server. Attempting this procedure
alone could result in personal injury or equipment damage.
Align the mounting brackets that are attached to the server sides with the front of the empty slide
a.
rails.
Push the server into the slide rails until it stops at the internal stops.
b.
Push the plastic installation release clip on each mounting bracket toward the server rear (see item
c.
5 in
rack posts.
d.
Close the front-flange latches to secure the server to the front rack posts.
Step 4
Attach the (optional) cable management arm (CMA) to the rear of the slide rails:
The orientation in these instructions refers to a view from the front of the server.
Note
Slide the plastic clip on the right end of the CMA length-adjustment slider (item 2) into the rear of
a.
the right slide rail (item 1) until it clips onto the plastic retaining flange inside the slide rail. See
Figure
b.
Expand the CMA length-adjustment slider (item 2) until its left end aligns with the rear of the left
slide-rail assembly (item 3).
Slide the innermost CMA attachment clip (item 4) into the rear of the left slide rail (item 3) and clip
c.
it onto the CMA flange that is on the mounting bracket that is attached to the server.
Attach the two-hole slotted bracket (item 5) that is on the left end of the CMA length-adjustment
d.
slider to the left slide rail. Fit the two-hole slotted bracket over the two pegs inside the slide rail.
Attach the outermost CMA attachment clip (item 6) onto the CMA flange that is on the left slide rail.
e.
OL-20887-02
Attaching Mounting Brackets to the Server
1
2
3
Figure
2-4), and then continue pushing the server into the rack until its front flanges touch the
2-5.
4
5
2
Mounting peg (four)
4
Removal release clip
Cisco UCS C210 Server Installation and Service Guide
2-7

Advertisement

Table of Contents
loading

Table of Contents