Cisco UCS C210 Installation And Service Manual page 23

Generations m1 and m2
Hide thumbs Also See for UCS C210:
Table of Contents

Advertisement

Chapter
To install the slide rails and the server into a rack, follow these steps:
Install the slide rails into the rack:
Step 1
Use two people to help keep the slide rails and server level during installation. You can use a tape
Tip
measure and level or count the holes in the rack posts to ensure that the slide rails and server are level.
Align the slide-rail assembly inside the rack posts with the length-adjustment bracket (item 4)
a.
toward the rear of the rack (see
Compress the length-adjustment bracket until the mounting pegs (item 6) and locking clips (item 5)
b.
on the slide-rail assembly engage the desired rack holes on the front and rear rack posts.
If your rack has #10-32 rack-post holes, align the mounting pegs with the holes and then compress
the spring-loaded pegs to expose the #10-32 inner peg (see
Figure 2-2
1
1
Front-left rack post
3
Slide-rail assembly
5
Locking clip (one on each end of assembly)
The mounting pegs that protrude through the rack-post holes are designed to fit round or square #12-24
Note
holes, or #10-32 holes when the mounting peg is compressed (see
rack-post holes, align the mounting pegs with the holes and then compress the spring-loaded pegs to
expose the #10-32 inner peg.
OL-20887-02
Figure
Attaching a Slide-Rail Assembly
3
2-2).
Figure
4
2
Rear-left rack post
4
Length-adjustment bracket
6
Mounting pegs (two on each end of assembly)
Figure
Cisco UCS C210 Server Installation and Service Guide
2-3).
2
5
6
2-3). If your rack has #10-32
2-5

Advertisement

Table of Contents
loading

Table of Contents