Figure 2-3
1
2
1
Pegs in standard (uncompressed) position
c.
Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
and lock in place.
Attach the second slide-rail assembly to the opposite side of the rack. Ensure that the two slide-rail
d.
assemblies are level and at the same height with each other.
Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
e.
and lock in place.
You can optionally use the #2 Phillips screws that come with the slide rails to increase stability after
Tip
installation. These screws can be installed on the front attachment bracket on each assembly, but are not
required.
Attach mounting brackets to the server:
Step 2
Set a mounting bracket (item 3) on the side of the server, aligning its keyed holes over the pegs on
a.
the server (item 2). The plastic installation release clip (item 5) on the bracket should be toward the
server front. See
Push the mounting bracket toward the server rear until the locking clip clicks over the server peg.
b.
Attach the remaining mounting bracket to the opposite side of the server.
c.
You can optionally use the #1 Phillips screws that come with the slide rails to increase stability after
Tip
installation. You can install two of these screws on each side of the server to more permanently attach
the mounting brackets to each side of the server, but they are not required.
Cisco UCS C210 Server Installation and Service Guide
2-6
Spring-Loaded Mounting Pegs
Figure
2-4.
2
Pegs compressed to expose 10-32 inner peg