Power Supply Concept - Fujitsu PRIMERGY BX600 S2 Operating Manual

Fujitsu server user manual
Table of Contents

Advertisement

14

Power Supply Concept

In the basic configuration, the PRIMERGY BX600 S2 base unit contains two hot
swap power supply units (PSU1 and PSU2 in
adapt automatically to any voltage within the range 200 V - 240 V.
PSU4
PSU2
Figure 88: PRIMERGY BX600 S2 basic unit: power supply units
To provide a redundant power supply, a third or fourth power supply unit can be
installed (PSU3 and PSU4 in
If one of the four power units fails, the other two/three units will ensure the unit
continues to operate normally. The defective power supply unit can be replaced
while the unit is still running (hot swap).
I
Please make sure that each of the power supply units is connected to a
different phase. This will provide you with additional phase redundancy
for high availability configurations. If one phase has failed, the power
supply units connected to the other phases keep active. You can get full
phase redundancy with up to three power supply units. With four power
supply units, two of them are to be connected to one phase (see also
"Related Publications" on page
PRIMERGY BX600 S2 Basic Unit
figure
figure
88).
165).
88). The power supply units
PSU3
PSU1
139

Advertisement

Table of Contents
loading

Table of Contents