Enable
Start Date
Start Time
Action
Acts
Check to enable the schedule.
Specify the starting date of the schedule.
Specify the starting time of the schedule.
Specify which action should be applied during the period of the
schedule.
WAN UP/DOWN – WAN connection will be activated /
inactivated based on the time schedule configured here.
WiFi UP/DOWN – Wireless Wi-Fi connection will be
activated / inactivated based on the time schedule configured
here.
VPN UP/DOWN - VPN connection will be activated /
inactivated based on the time schedule configured here.
Specify how often the schedule will be applied
Once -The schedule will be applied just once
Routine /Weekday -Specify which days in one week should
perform the schedule.
162
Vigor2130 Series User's Guide