EPSON Stylus Scan 2000
4.2 Disassembly Procedures
The flowchart below shows procedures for disassembly.
Start
Removal of the
housing
Removal of printer
consumables
Removal of the
circuit board tray
Removal of the
Scanner
Disassembly of the
Printer Mechanism
Disassembly & Assembly
Before disassembly, refer to the User's Guide to perform these steps.
Ink cartridge
CR home
removal
position
Front cover
Rear cover
assembly
Waste ink pads
Cleaning assembly
B101 MAIN
B101 PSB/PSE
Board
board
Upper frame
Scanner removal
removal
Printhead
PF motor
removal
Power off &
unplug
Control panel
CR Motor
CR HP sensor
removal
Disassembly Procedures
Upper cover
ASF removal
Paper edge
Shaft removal
sensor removal
ASF home
position sensor
Paper feed
Revision A
76