Powering Down The System - AT&T MERLIN LEGEND Release 3.0 Installation Manual

Communications system
Hide thumbs Also See for MERLIN LEGEND Release 3.0:
Table of Contents

Advertisement

Powering Down the System

Powering Down the System
You may need to power down the system for troubleshooting during
installation, or to add new equipment to the carrier.
CAUTION:
Follow these steps in the exact sequence.
To power
down
1
Turn off the power supply on the basic carrier.
2
Turn off the power supplies on the expansion carriers.
3
Unplug any auxiliary power units.
Because the power supplies are already off, the sequence for removing
auxiliary power cords is not important.
4
Unplug the system from the AC outlet.
the system, follow the steps below.
Installing the Control Unit 2-45

Advertisement

Table of Contents
loading

Table of Contents