System Setup Procedure; Section 2 - Omron NE1A-SCPU01 - 07-2009 Operation Manual

Safety network controller
Hide thumbs Also See for NE1A-SCPU01 - 07-2009:
Table of Contents

Advertisement

System Setup Procedure

1-3
System Setup Procedure
Working phase
System design
Programming
Installation and wiring
Configuration
User test
System operation
The general working phases until the Safety System is operational are shown
below.
3. Installation and Wiring
The NE1A-series Controller information required in each phase is described
in the following sections.
• System overview and example configurations
• Specifications and functions
• Performance
• Programming guidelines
• Function block specifications
• Node address and baud rate settings
• Installation location
• Device connections
• Power supply wiring
• Connection with I/O devices
• Wiring for DeviceNet
• EtherNet/IP wiring
• Configuration method
• Error classification and error history
• Maintenance and inspection
Refer to the following manuals for information on DeviceNet and EtherNet/IP
installation, DeviceNet Safety System construction, Network Configurator
operation, Programming Device operation, and other devices used in the
safety system.
Item
Installation of DeviceNet
Installation of EtherNet/IP
1. System Design
4. Configuration
5. User Testing
6. System Operation
Required information
Manual name
DeviceNet User's Manual
NE1A-series DeviceNet Safety Network Control-
ler Operation Manual
Section 1-3
2. Programming
Details
Section 1
Section 2, Section 4 to 10
Section 11
Section 8
Section 4-1
Section 3
Section 9
Section 12
Section 13
W379
Z906-E1-07
or higher
Cat. No.
17