Basic Operating Procedure; Overview; Section 2 - Omron GRT1 - 27-11-2006 Operation Manual

Profibus communication unit
Table of Contents

Advertisement

Basic Operating Procedure

1-4

Basic Operating Procedure

1-4-1

Overview

The following diagram provides an overview of the installation procedures.
For experienced installation engineers, this may provide sufficient informa-
tion. For others, cross-references are made to various sections of this manual
where more explicit information is given.
Mount the GRT1-PRT PROFIBUS Unit and
the SmartSlice I/O Units
(See section 2-2 Installing the GRT1-PRT
Unit)
Wire the GRT1-PRT PROFIBUS Unit and the
SmartSlice I/O Units
(See section 2-3 Wiring the GRT1-PRT)
Setup the PROFIBUS network
(See section 2-4 Setting up a PROFIBUS
Network)
Power up the GRT1-PRT and Perform initial
setup (See section 3-3 Setup the GRT1-PRT
Configuration)
Configure the PROFIBUS DP Master Unit
(See section 3-3 Setup the GRT1-PRT
Configuration)
PROFIBUS DP starts communicating,
confirmed by the COMM LED continuously
lit. Check status of other LED Indicators (See
section 3-4 Operating the Network)
Section 1-4
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profibus - 27-11-2006Smartslice grt1-seriesGrt1-prt

Table of Contents