Soldering; Assembling The Hood - Omron CJ2 CPU UNIT User Manual

Cj2 cpu unit hardware
Hide thumbs Also See for CJ2 CPU UNIT:
Table of Contents

Advertisement

4
Use wire strippers to remove the insulation from the end of each wire.
5 mm
5
Wrap electrician's tape over the top and end of the cut sheath.

Soldering

1
Place heat-shrinking tubes over all wires.
2
Pre-solder all wires and connector terminals.
3
Solder the wires.
1 mm
Heat-shrinking tube
(inner dia. 1.5, l = 10)
4
Move the heat-shrinking tubes onto the soldered area and shrink them into place.

Assembling the Hood

Assemble the connector hood as shown.
FG Connection
Ground plate
CJ2 CPU Unit Hardware User's Manual
Electrician's tape
Soldering iron
Heat-shrinking tube
No FG Connection
Aluminum foil tape
Appendices
A-135

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents