Preparing The Cable; Connecting The Shield Line To The Hood (Fg); Not Connecting The Shield To The Hood (Fg) - Omron CJ2 CPU UNIT User Manual

Cj2 cpu unit hardware
Hide thumbs Also See for CJ2 CPU UNIT:
Table of Contents

Advertisement

Appendices
Wiring Connectors
Use the following procedures to wire connectors.

Preparing the Cable

Lengths for steps in the procedure are provided in the diagrams.

Connecting the Shield Line to the Hood (FG)

1
Cut the cable to the required length, leaving leeway for wiring and laying the cables.
2
Use a razor blade to cut away the sheath, being careful not to damage the braiding.
3
Use scissors to cut away all but 10 mm of the exposed braiding.
4
Use wire strippers to remove the insulation from the end of each wire.
5 mm
5
Fold the braiding back over the end of the sheath.
6
Wrap aluminum foil tape over the top of the braiding for one and a half turns.

Not Connecting the Shield to the Hood (FG)

1
Cut the cable to the required length, leaving leeway for wiring and laying the cables.
2
Use a razor blade to cut away the sheath, being careful not to damage the braiding.
3
Use scissors to cut away the exposed braiding.
A-134
40 mm (RS-232C)
10 mm
Aluminum foil tape
40 mm (RS-232C)
10 mm
CJ2 CPU Unit Hardware User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents