Wiring Ducts; Routing Wiring Ducts - Omron CJ2 CPU UNIT User Manual

Cj2 cpu unit hardware
Hide thumbs Also See for CJ2 CPU UNIT:
Table of Contents

Advertisement

Wiring Ducts

30 mm
40 mm
Precautions for Correct Use
Precautions for Correct Use
Tighten terminal block screws and cable screws to the following torques.
Terminal Screws
M4:
M3:
Cable Connector Screws
M2.6: 0.2 N·m

Routing Wiring Ducts

Install the wiring ducts at least 20 mm between the tops of the Racks and any other objects, (e.g.,
ceiling, wiring ducts, structural supports, devices, etc.) to provide enough space for air circulation
and replacement of Units.
CPU Rack
Expansion Rack
Fuses, relays, timers, etc.
(NOT heat-generating equip-
ment, power equipment, etc.)
CJ2 CPU Unit Hardware User's Manual
81.6 to 89 mm
CPU
Rack
30 mm
Expan-
sion
Rack
Duct
1.2 N·m
0.5 N·m
Output duct
Input duct
Terminal blocks
for PLC
Mounting
bracket
Power duct
200 mm min.
Breakers,
fuses
Power
equipment
such as
transformers
and magnetic
relays
Terminal blocks for
power equipment
5 Installation
5
5-7