Download Print this page

Toshiba GR-200-5 Instruction Manual page 1064

Multi functional protection ied

Advertisement

Preparations
Test equipment
The following test equipment is required for the commissioning tests.
1 Three-phase voltage source
2 Single-phase current sources
1 Dynamic three-phase test set (for protection scheme test)
1 DC power supply
3 DC voltmeters
3 AC voltmeters
3 Phase angle meters
2 AC ammeters
1 Time counter, precision timer
1 PC (not essential)
Relay settings
Before starting the tests, it must be specified whether the tests will use the user's settings or
the default settings.
Visual inspection
After unpacking the product, check for any damage to the IED case. If there is any damage,
the internal module might also have been affected. Contact the vendor.
Relay ratings
Check rating items from the nameplate on the IED. The items can be; relay type and model,
AC voltage, current and frequency ratings, and auxiliary DC supply voltage rating.
Local PC with GR-TIEMS
To examine the IED locally, connect user's PC with IED using USB or LAN cable. The user
needs to install GR-TIEMS engineering tool in the PC.
During commissioning and maintenance, check wire connection and observe relay output
signals. The user can see the signals whether the relay operations are appropriate or not.
- 1044 -
6F2T0207 (0.01)
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6