Download Print this page

Toshiba GR-200-5 Instruction Manual page 1047

Multi functional protection ied

Advertisement

screen shown in Figure 12.8-6); the user can configure each BI signal in a manner
similar to that described for BI01.
After selecting OP in Figure 12.8-6, use the following screen to start the simulation
test.
Figure 12.8-8 Execution menu of BI test
If key ENTER is pressed in Figure 12.8-8, the status will change to test status. The
following screen will be displayed after pressing the key ENTER. Figure 12.8-9
shows that the IED is in simulation test mode.
Figure 12.8-9 Running test menu
Note: The user has to continue to depress the key ENTER on the IED front panel during
the simulation test period. The simulation status will be released if key ENTER is
not pressed.
Binary output test screen: The user is able to test a binary output circuit.
Figure 12.8-10 is an example of how to select a binary output from the Test
Mode screen.
Figure 12.8-10 Binary output menu
Figure 12.8-11 shows selection of IO#2 (Slot #2).
Slot#3
10:48
Press and hold
ENTER
to operate
Press <- to return
To previous page
Slot#3
10:48
Press and hold ENTER
to operate
Operating..
Press <- to return
To previous page
Binary Output
10:48
1/2
Slot#2
Slot#3
- 1027 -
>
>
6F2T0207 (0.01)
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6