Download Print this page

Toshiba GR-200-5 Instruction Manual page 1054

Multi functional protection ied

Advertisement

Unpack and inspection of hardware and software
The user should unpack and check an IED before use. Be in touch with Toshiba at email
(www.toshiba-relays.com) for any issues.
Opening and inspecting a relay (IED) package
(i)
Open a relay package and inspect physical damage if any. Ensure that the following items are
included in the package. If there is any noticeable physical damage, or any of the above items
are missing, contact your agent.
- Relay (IED) unit
- Test record:
- Installation guide:
- Function keys label:
- LEDs Label:
- Screws and nuts for rack mounting
- Flange cover:
Manufacture settings (In, Vn, fn, Vdc)
(ii)
Find the hardware nameplate. The user should know that the IED is produced correctly in
terms of DC rating (Vdc) and voltage (Vn).
Ordering positions
7
8
9
A
B
C D
- 5 1 - 6 M P - 0 0 - L L - 5 1 -
-51-6MP-00-LL-51-AA0
-5055-LL2-6E
AB01234 CD 0001-001
Month — Year
Figure 13.3-1 Hardware nameplate on the case side (sample)
Note: See
E
F
G H
J
A A 0
Appendix: Ordering
(→page 1133) for more details.
- 1034 -
One sheet
One sheet
One sheet
One sheet
One set
One set
K
L
AC rated current (In)
System frequency (fn)
Binary IO terminal type
CPU type code
Case size
DC rated voltage (Vn)
1A/5A
1A/5A
100-120V
50Hz/60Hz
110-250Vdc
110-250Vac
Year
6F2T0207 (0.01)
Rated current (In)
Rated neutral current (Ion)
Rated voltage (Vn)
Rated frequency (fn)
DC voltage rating (Vdc)
AC voltage rating (Vac)
xxx
GRE200 (5,6)

Advertisement

loading

This manual is also suitable for:

Gr-200 seriesGr-200-6