EAS20193
GENERAL CHASSIS (7)
Removing the front cowling assembly
7 Nm (0.7 m
kgf, 5.1 ft
•
1
7 Nm (0.7 m
kgf, 5.1 ft
•
1.5 Nm (0.15 m
1.5 Nm (0.15 m
Order
Upper leg shield
1
Front lower panel
2
Lower leg shield cover
3
Headlight coupler
4
Auxiliary light coupler
5
Front turn signal light coupler
6
Front cowling assembly
7
Lower leg shield
Ibf)
•
3
4
5
Ibf)
•
kgf, 1.1 ft
Ibf)
•
•
kgf, 1.1 ft
Ibf)
•
•
Job/Parts to remove
GENERAL CHASSIS (7)
4.0 Nm (0.40 m
kgf, 2.9 ft
•
6
7
Q'ty
Refer to "Removing the meter assembly".
1
2
1
Disconnect.
1
Disconnect.
1
Disconnect.
1
1
4-14
1.5 Nm (0.15 m
kgf, 1.1 ft
•
2
Ibf)
•
(12)
Remarks
Ibf)
•
2