Yamaha MBK MW125 2014 Service Manual page 246

Table of Contents

Advertisement

Secondary sheave nut
75 Nm (7.5 m·kgf, 54 ft·lbf)
TIP
While holding the secondary sheave with the
sheave holder "2", tighten the secondary sheave
nut with the locknut wrench "3".
Sheave holder
90890-01701
Primary clutch holder
YS-01880-A
Locknut wrench
90890-01348
Locknut wrench
YM-01348
1
2. Install:
• Clutch housing "1"
• Spacer
• O-rings
New
• Clutch housing nut "2"
Clutch housing nut
35 Nm (3.5 m·kgf, 25 ft·lbf)
TIP
While holding the clutch housing with the sheave
holder "3", tighten the clutch housing nut.
Sheave holder
90890-01701
Primary clutch holder
YS-01880-A
V-BELT AUTOMATIC TRANSMISSION
2
3
5-43
1
3. Install:
• Primary sliding sheave assembly "1"
TIP
When installing the primary sliding sheave as-
sembly, hold the cam to prevent the primary
sheave weights from falling out of the primary
sliding sheave.
1
4. Install:
• V-belt "1"
ECA21720
NOTICE
Do not allow grease to come in contact with
the V-belt.
TIP
• Install the V-belt with the printed arrow mark on
the V-belt facing in the direction shown in the il-
lustration.
• Install the V-belt onto the primary sheave side.
1
5. Install:
• Primary fixed sheave "1"
• One-way clutch
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mbk mw125f 2015

Table of Contents