Fault Alarm Connectors; Installing The Renewable Energy Switch; Installation Steps - Planet Switch User Manual

Industrial renewable power 5-port gigabit managed switch/router with 4-port 802.3at poe+
Table of Contents

Advertisement

2.1.4

Fault Alarm Connectors

The fault alarm contacts are in the middle (3 & 4) of the terminal block connector as the picture shows below.
Inserting the wires, the Renewable Energy Switch will detect the fault status of the power failure.
*When the system is "ON", the fault alarm is "off".
*When the system is "OFF", the fault alarm will "trigger".
1. The wire gauge for the terminal block should be in the range of 16 ~ 20 AWG.
2. When performing any of the procedures like inserting the wires or tightening the wire-clamp
screws, make sure the power is OFF to prevent from getting an electric shock.

2.2 Installing the Renewable Energy Switch

This section describes how to install your Renewable Energy Switch and make connections to the Renewable
Energy Switch. Please read the following sections and perform the procedures in the order being presented.
To install your Renewable Energy Switch on a desktop or shelf, simply complete the following steps.
In this paragraph, we will describe how to install the Renewable Energy Switch and the installation points
attended to it.
2.2.1

Installation Steps

The following section describes the hardware installation of the BSP-360. Before connecting any network
device to the BSP-360, read this chapter carefully.
Industrial Renewable Energy 4-Port 10/100/1000T