Planet Switch User Manual page 37

Industrial renewable power 5-port gigabit managed switch/router with 4-port 802.3at poe+
Table of Contents

Advertisement

Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch/Router
BSP-360
This utility shows all necessary information from the devices, such as MAC address, device name, firmware
version and device IP subnet address. It can also assign new password, IP subnet address and description of
the devices.
After setup is completed, press the "Update Device", "Update Multi" or "Update All" button to take effect.
The definitions of the 3 buttons above are shown below:
Update Device: Use the current setting on one single device.
Update Multi: Use the current setting on multi-devices.
Update All: Use the current setting on all devices in the list.
The same functions mentioned above also can be found in "Option" tools bar.
By clicking the "Control Packet Force Broadcast" function, it allows you to assign new setting value to the
Ultra PoE Managed Injector Hub under a different IP subnet address.
Press the "Connect to Device" button and then the Web login screen appears in
Figure 3-3-2.
Press the "Exit" button to shut down Planet Smart Discovery Utility.
37

Advertisement

Table of Contents
loading

Table of Contents