Management; Overview; Requirements - Planet Switch User Manual

Industrial renewable power 5-port gigabit managed switch/router with 4-port 802.3at poe+
Table of Contents

Advertisement

This chapter describes how to manage the Renewable Energy Switch with the following topics included:

Overview

Requirements

Management Method
3.1 Overview
The Renewable Energy Switch provides a user-friendly, Web interface where you can perform various device
configuration and management activities, including:
System
SNMP
Power over Ethernet
Battery Management
3.2 Requirements
PLANET BSP-360 provides a remote login interface for management purposes. The following equipment is
necessary for further management:
 Workstation is installed with Ethernet NIC (Network Interface Card)
 Choice of Internet browsers includes Windows XP/2003, Vista, Windows 7, Windows 8, Windows 10,
Windows 11, MAC OS X, Linux, Fedora, Ubuntu or other platforms compatible with TCP/IP protocols.
• The above workstation is installed with Web browser and JAVA runtime environment plug-in.
 Ethernet Port connection
• Use standard network (UTP) cables with RJ45 connectors.
 PV and battery
• Either two 12V lithium or lead-acid batteries, or one 24V lithium or lead-acid battery can be used.
• The maximum operating voltage of PV is 45V
It is recommended to use Chrome 98.0.xxx or above to access the
BSP-360.
Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch/Router

3. MANAGEMENT

32
BSP-360

Advertisement

Table of Contents
loading

Table of Contents