Planet Switch User Manual page 24

Industrial renewable power 5-port gigabit managed switch/router with 4-port 802.3at poe+
Table of Contents

Advertisement

Please follow the following steps to install the system:
Step 1. Installing BSP-360
Place the BSP-360 in a desired location using the wall-mount or DIN-rail fixtures.
a. Please install the BSP-360 in a proper enclosure or shelter.
b. The BSP-360 must be grounded.
Step 2. Installing Battery
Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch/Router
24
BSP-360

Advertisement

Table of Contents
loading

Table of Contents