Figure 122. Security bezel installation
Step 2.
Use the key to lock the security bezel to the closed position.
Figure 123. Locking the security bezel
After installing the security bezel, push or install the server into the rack if necessary. See ThinkSystem
SR850 Rack Installation Guide that comes with the rail kit.
Demo video
Watch the procedure on YouTube
System board air baffle and the power interposer replacement
Use this procedure to install or remove the system board air baffle and the power interposer.
Note: If your server comes with four processors, skip this section and go to
expansion tray replacement" on page
Remove the system board air baffle and the power interposer
Follow the instructions in this section to remove the system board air baffle and the power interposer.
Note: If the server comes with a processor and memory expansion tray, it doesn't come with this
component
Before removing the system board air baffle, complete the following steps:
1. Read the safety information and installation guidelines (see
Guidelines" on page
ThinkSystem SR850 Maintenance Manual
126
119.
55).
"Processor and memory
"Safety" on page iii
and
"Installation