INSTALLATION PROCEDURE
@2 A ttach Packing(D)[thickness 10mm] around the opening in the partition and light shield panel. Attach
the packing only to the upper, left, and right sides of where the wall and light shield panel will meet.
@3 L ower the insertion table side legs so that the SRX-101A is leveled. Taking special care of the unit's
left and right side position, move the processor up against the partition, and then level the unit once
again.
Notes :
1. Push the light shield up against the partition so that it is bowed slightly towards the darkroom.
This position will give the best light shielding results.
2. If the unit cannot be leveled with only the adjustment bolt on the support, shim the support up
using material that will not change shape, like steel plate.
@4 A ttach the light shield rubber lining to cover the opening between floor and the bottom of the light
shield panel as below. Cut Packing(B)[thickness 20mm] into a block whose length will match the
rubber lining, and stick it to the rubber lining.
SERVICE MANUAL
96
Processing Tank
Film Insertion Table
Light Shield
Wall
Panel
Light Shield Rubber Lining
Light Room Side
Wall
Darkroom Side
Packing(D)
Wall
Packing(B)