C.10: Notifier® Ul; C.10.1: Connection Options; C.10.2: To Use A Nup Connection - Honeywell HON-CGW-MBB Installation And User Manual

Connected life safety services clss gateway
Table of Contents

Advertisement

NOTIFIER® UL
C.10 NOTIFIER® UL
C.10.1 Connection Options
The gateway operates only with the NOTIFIER fire alarm control panels as listed in the
table below:
C.10.2 To Use a NUP Connection
Some NOTIFIER panel variants use a NUP connection with the CLSS Gateway.
1. On the Gateway Side
Connect the NUP cable to the NUP port of the gateway board.
The NUP port is labeled as 6 in the
2. On the Panel Side
In the NUP socket of the panel:
• Stand-alone Panel: Connect the NUP cable.
HON-CGW-MBB
Fire Panel NUP
NUP-to-NUP cable (75577A)
CLSS Gateway - Installation and Users' Manual | P/N:LS10248-000HW-E | REV. F | FEB/11/2022
Table C.8: NOTIFIER UL Panel Connection Options
Fire Alarm Panel Models
ONYX Panels
NFS-320
NFS2-640
NFS2-3030
INSPIRE Panels
N16E
N16X
NUP
No
Connec on
J1
Red
Black
White
Green
Brown
Required Equipment:
Figure C.23: Stand-alone Panel: NUP Connection
RS-485
UART/TTL
No
No
No
No
No
No
No
No
No
No
Figure
C.23.
er Onyx Panel
Panel
Connecting to the Panels
NUP
USB
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
137

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents