Figure 158: Installing the thermal cable (D)
▶ Place the cable into the space on the side of the fan cage as shown (1).
Concluding steps
▶ Install the left high speed riser module, see
riser module" on page
▶
"Installing the top covers" on page
▶ If applicable, install the front bezel mounted on the left end, see
the HDD/SSD x6 front bezel" on page
▶ If applicable, install the front bezel mounted on the left end, see
the HDD/SSD x4 front bezel" on page
▶
"Sliding the server enclosure into the rack" on page
▶ If applicable, install the HDD/SSD modules until slot 6 from the left into the
relevant HDD/SSD cage, see
page
114.
▶ If applicable, install all 2.5-inch HDD/SSD dummy modules until slot 6 from
the left into the relevant HDD/SSD cage, see
module" on page
▶ If applicable, install the front bezel, see
page
47.
▶ If the server node was originally installed in server node bay 2, install it, see
"Installing server nodes in the server enclosure" on page
▶
"Connecting the power cord" on page
▶
"Switching on the server nodes" on page
CX400 M6
153.
56.
"Installing a 2.5-inch HDD/SSD module" on
117.
Upgrade and Maintenance Manual
"Installing the new high speed
142.
142.
68.
"Installing a 2.5-inch dummy
"Installing the front bezel" on
84.
86.
Front panel
"Installing
"Installing
81.
191