Fujitsu PRIMERGY CX400 M6 Upgrade And Maintenance Manual page 162

Table of Contents

Advertisement

Power distribution board
Figure 126: Fastening the screws
▶ Fasten the power distribution board kit with four screws (see circle).
▶ Place the air duct on the power distribution board kit.
▶ Fasten the air duct with two screws.
Concluding steps
"Installing the fan cage" on page
"Installing the fan module" on page
"Installing the new high speed riser module" on page 153
"Installing the top covers" on page
"Sliding the server enclosure into the rack" on page
▶ If applicable, install the front bezel, see
page
47.
"Installing the new hot-plug PSU" on page
"Installing server nodes in the server enclosure" on page
162
126.
148.
56.
"Installing the front bezel" on
Upgrade and Maintenance Manual
68.
101.
81.
CX400 M6

Advertisement

Table of Contents
loading

Table of Contents