14
Confirm that the synchronized
data is now shown in the color
of Synchronized and The
Synchronization process
successfully finished
message is displayed.
If there is no problem, click
Close.
* The Synchronization
process successfully
finished message indicates
that the data in the controller
matches the project data in the
Sysmac Studio.
* If Synchronization fails, check
the physical connections and
redo the procedure from step
1.
15
In Controller Status, confirm
that the ERR/ALM indicator is lit
green and that the mode is
PROGRAM mode.
Precautions for Correct Use
If you change connection settings (in the tag data link table) after executing Synchronize,
you will not be able to transfer the connection settings (in the tag data link table) by
executing Synchronize again.
To transfer the connection settings in this case, click Transfer to Controller in the Built-in
EtherNet/IP Port Settings Connection Settings Tab Page as shown in the right figure.
7. EtherNet/IP Connection Procedure
43