Pre-Operation Inspection - Shindaiwa DG150MM Owners And Operation Manual

Diesel engine generator
Table of Contents

Advertisement

Turn the circuit breaker to "ON".
4
Push the TEST button on Earth Leakage Relay.
5
When the button is pushed, the earth leakage
indicator turns "ON" and circuit breakers are
positioned in the middle between "ON" and "OFF"
positions simultaneously, the device works
normally.
Push the reset button. The earth leakage indicator
6
turns "OFF" subsequently.
Turn (Push-down) the circuit breaker (lever) to
7
"OFF" position.
In the event you cannot complete every step of the above procedure to the end, the
device is out of order. Consult with our authorized distributor or our engineering
section and ask to repair.
(3) Earth leakage Relay has activated
If the earth leakage breaker relay has been activated, the earth leakage indicator
turns ON, and the breaker (lever) is tripped and positioned in the middle between
ON and OFF.
When this occurs, stop the engine and repair the location of earth leakage before
restarting operation.(In the case the earth leakage indicating lamp does not turn to
ON simultaneously, the cause is Over-Loaded.)

8. Pre-Operation Inspection

WARNING : ELECTRIC SHOCK/INJURY
 Always be sure to stop the engine and remove the starter key when
performing inspection or maintenance.
 Do not open the check door during operation. Keep away from moving parts
such as cooling fan and fan belt.
CAUTION : BURNS
 Do not touch the engine and surrounding components immediately after
stopping the engine as they are still extremely hot.
CAUTION : FIRE
 Always be sure to wipe up any spilled fuel or oil.
Indicator
20
TEST button
RESET button
Earth Leakage Relay

Advertisement

Table of Contents
loading

Table of Contents