Commissioning And Testing; Turn-Up - ADTRAN Total Access 374 Installation And Maintenance Manual

4-pots, 4-gige mdu ont
Hide thumbs Also See for Total Access 374:
Table of Contents

Advertisement

Total Access 374 4-POTS, 4-GigE MDU ONT Installation and Maintenance Guide

Commissioning and Testing

This section provides detailed information on the following:
NOTE
Depending on the local service provider's requirements the technician may
be required to perform additional tests beyond the ONT on the Customer
Provided Equipment (CPE) wiring and/or equipment. If this is the case, a
power meter may be used to test the upstream and downstream signal types
for voice, data, and video.

Turn-Up

Initial turn-up of the ONT involves applying power and observing LEDs for status infor-
mation. To complete the turn-up of the ONT, complete the following steps:
1. Plug the green UPS connector into the male connector of the UPS.
2. Check to ensure the AC, output, and battery LEDs are green and functioning. The UPS is
3. View the LEDs on the ONT as they cycle through start-up diagnostics. A properly
2-26
"Turn-Up"
below
"Secure the Unit"
on page 2-28
"Test for POTS Line Faults"
"Register the ONT"
on page 2-28
"Provision Ethernet Interface at OLT"
now ready for normal operation.
installed ONT cycles through a sequence of operations during startup and power-up
phases.
Table 2-6
on page 2-27 shows the normal LED status once the startup and power-
up sequences are complete (approximately 30 seconds).
In addition to the front panel LEDs, the ONT has LEDs that are integral to the Ethernet
RJ-45 jacks.
on page 2-28
on page 2-29
61287703G1-5B

Advertisement

Table of Contents
loading

Table of Contents