CAUTION
■ Use caution when routing wires and cables. Avoid severe bending and
routing over sharp edges. Use grommet material when possible to avoid
wear on cable insulation.
■ To reduce the risk of fire, use minimum no. 26 AWG telecommunications
line cord.
Installation of the Limited Power Source (LPS) will be dictated by on-site conditions and local
telephone company practices. Refer to
the following steps to complete the installation.
1. Install the LPS wire run from the ONT to the connector of the LPS via the customer pro-
2. If necessary, tie wrap both the 6 AWG ground wire and LPS wire run to the buried fiber
61287703G1-5B
vided PVC conduit (or method used by your local telephone company). For power,
ADTRAN recommends using 16 AWG wire at a maximum of 100 feet (30.5 meters). For
alarm signals, ADTRAN recommends using 24 AWG wire.
drop cable riser conduit.
Section 2, Installation and Testing - ONT Installation
"Install Power /Alarm Connector"
on page 2-16 and
2-9