Table 2-3
Refer to
3. Route the Power/Alarm wire through the rubber grommet as shown.
4. Terminate the two power leads (Pins 6 and 7), and the five UPS leads if needed by raising
5. Insert the wires in the appropriate plugs.
6. Lower the levers using a flat-blade screwdriver. Internally the insulation displacement
7. Reconnect the IDC Connector to the bottom of the Electronics Module.
8. Tie wrap the power cable to the plastic housing that holds the rubber grommets.
61287703G1-5B
lists the Pinout designations for the Power/Alarm Connector Pinouts.
Table 2-3. ONT Power/Alarm Connector Pinout
Pin
1
2
3
4
5
6
7
Figure 2-11
on page 2-18 and complete the following steps:
the levers on the appropriate connector plugs.
connectors cut the insulation and make the electrical connection.
Section 2, Installation and Testing - Fiber Installation
Description
Low Battery
Battery Missing
Replace Battery
On Battery
Signal Return
12 V Return
+12 VDC
Color
Orange
Blue
Brown
Grey
Green
Black
Red
2-17