Total Access 374 4-POTS, 4-GigE MDU ONT Installation and Maintenance Guide
Fiber Termination
Refer to
1. Remove the plastic Fiber Protective Cover.
2. Connect the Fiber to SC/APC connectors as shown.
3. Replace the protective cover.
The completed fiber installation should look like
2-14
Figure 2-8
for instructions on terminating the Fiber in the NID Housing.
Protective Fiber
Cover
Figure 2-8. Connect Fiber
Figure 2-9
Pre-Installed
Fiber
SC/APC
Connector
on page 2-15.
61287703G1-5B