ADTRAN Total Access 3000 Installation And Maintenance Manual

ADTRAN Total Access 3000 Installation And Maintenance Manual

Hi-cap rt solution
Hide thumbs Also See for Total Access 3000:
Table of Contents

Advertisement

®

Total Access 3000

Hi-Cap RT Solution
Installation and Maintenance Manual
Document Number: 64192MB3K2LX-1B
October 2007

Advertisement

Table of Contents
loading

Summary of Contents for ADTRAN Total Access 3000

  • Page 1: Total Access 3000

    ® Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Document Number: 64192MB3K2LX-1B October 2007...
  • Page 2 In no event will ADTRAN be liable for any special, incidental, or consequential damages or for commercial losses even if ADTRAN has been advised thereof as a result of issue of this document.
  • Page 3: Revision History

    Revision History Revision Date Description September 2004 Initial release October 2007 Removed references to the DC Disconnect Panel Conventions The following typographical conventions are used in this document: This font indicates a cross-reference link. indicates screen menus, fields, and parameters. This font indicates keyboard keys ( ).
  • Page 4 Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Training ADTRAN offers training courses on our products. These courses include overviews on product features and functions while covering applications of ADTRAN product lines. ADTRAN provides a variety of training options, including customized training and courses taught at our facilities or at customer sites.
  • Page 5: Table Of Contents

    Total Access 3000 Hi-Cap RT Solution Arrangement ........
  • Page 6 Total Access 3000 Components ........... 6 Table 3. Total Access 3000 Equipment-Side Cross-Connect Loop Wiring ......9 Table 4.
  • Page 7: Introduction

    • DS3 NIU3 3-Slot Shelf with NIU3 Monitor and Test Card • Total Access 23-Inch Heat Baffle and Fiber Tray • Total Access 23-Inch Fan Module Assembly • Two Total Access 3000 Shelves • 200-Pair Protector Block • Equipped for 150 Ahr battery installation (customer provided)
  • Page 8: Features And Benefits

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Table 1. Component Documentation Component Document Number Total Access 3000/3010 System Manual 61181001L1-1 Total Access 3000 23-Inch Chassis Installation and Maintenance Practice 61181001L1-5 Total Access 23-Inch Heat Baffle and Fiber Tray Job Aid...
  • Page 9: Equipment Chamber

    • Cross-Connect Panel • DS3 Protection Chassis • DS3 NIU3 3-Slot Shelf • Total Access 23-Inch Heat Baffle and Fiber Tray with 23-Inch Fan Module Assembly • Total Access 3000 Shelves VALERE P O W ER Valere Power System/Rectifier with Controller Module...
  • Page 10: End Chamber

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual End Chamber An additional door on the left side of the cabinet provides access to the End Chamber. The End Chamber houses the following: • AC Load Center • 200-Pair Protector Block •...
  • Page 11: Battery Chamber

    DC powered and controlled from the ECC. The Total Access 23-Inch Fan Module Assembly provides additional cooling and air movement for the stacked Total Access 3000 shelves. The 23-Inch Fan Module Assembly is DC powered from the Valere Power System.
  • Page 12: Cabinet Specifications

    Installation” on page 17, for battery installation information. Total Access 3000 Hi-Cap RT Solution The Hi-Cap RT Solution uses the Total Access 3000 as the backbone for the local loop delivery platform. Table 2 lists the Total Access 3000 population of available common and access modules and accessories.
  • Page 13: Total Access 3000 Hi-Cap Rt Solution Arrangement

    Each Total Access 3000 shelf multiplexes 28 DS1 services (HDSL, HDSL2, HDSL4, or legacy T1) for a total of 56 circuits. The Total Access 3000 DS1 services originate from the 64-pin Champ connectors on the Total Access 3000 backplane and terminate to the Equipment-side of the Cross-Connect Panel.
  • Page 14: Figure 3. Hi-Cap Rt Solution Diagram

    Customer-Supplied DS3 Feed Customer-Supplied DS3 Feed DS3 Protection Chassis DS3 NIUS Chassis Splice Modules 1-25 28 X DS1 26-50 (HDSL or T1) Total Access 3000 Shelf 1 51-75 76-100 RS-485 101-125 126-150 Total Access 3000 28 X DS1 151-175 Shelf 2...
  • Page 15: Table 3. Total Access 3000 Equipment-Side Cross-Connect Loop Wiring

    Total Access 3000 Hi-Cap RT Solution Table 3. Total Access 3000 Equipment-Side Cross-Connect Loop Wiring Total Access 3000 Slot-to-Loop Assignment Cross-Connect Panel Positions HDSL Total Access 3000 Total Access 3000 Shelf 1 Shelf 2 Loop 1 Slot Loop 2 Loop 1...
  • Page 16 Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Table 3. Total Access 3000 Equipment-Side Cross-Connect Loop Wiring (Continued) Total Access 3000 Slot-to-Loop Assignment Cross-Connect Panel Positions HDSL Total Access 3000 Total Access 3000 Shelf 1 Shelf 2 Loop 1...
  • Page 17: Installation

    Installation INSTALLATION Installation is comprised of these main steps: • “Mounting the Cabinet” (Includes selecting and preparing the cabinet mounting location.) • “Wiring Connections” on page 14 • “DC Power Distribution” on page 16 • “Battery Installation” on page 17 •...
  • Page 18: Concrete Pad Location And Construction

    The template orients the mounting bolts and provides access to conduits in the pad. The Pad Mount Template Kit (ADTRAN P/N 3353CAB004) includes a steel mounting template and the required fasteners.
  • Page 19: Polemount Installation

    631-205-071. Polemount Kit The polemount kit (ADTRAN P/N 3353CAB006) is for cabinets with the End Chamber. The polemount assembly should be installed prior to transferring the Hi-Cap RT Solution cabinet to the installation site. The kit has the required supports, template platform, stabilizers, and fasteners for a secure installation.
  • Page 20: Wiring Connections

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Wiring Connections The procedures in this practice for bringing in power and data to the cabinet are supplemental to Emerson document 631-205-071, which provides detailed information and corresponding illustrations. WARNING Ensure AC power is disconnected at the source and tagged “Out of...
  • Page 21: Power And Ground Cables

    Installation Power and Ground Cables For detailed instructions on bringing AC power and ground into the cabinet, refer to “Section 3, AC Power” Emerson document 631-205-071. The Hi-Cap RT Solution cabinet accepts a separately protected 120 VAC single phase, 60 Hz circuit. Load sizes (breakers) vary from 10 amps to 30 amps.
  • Page 22: Dc Power Distribution

    TB1 terminals are euro style with a supply and return terminal for each load. Total Access 3000 Shelf 1 and Shelf 2, and the Total Access 23-Inch Fan Module Assembly have redundant power capability with both primary and secondary load share terminals on the backplanes.
  • Page 23: Battery Installation

    Installation Battery Installation Batteries are purchased separately and customer installed. WARNING Batteries can be a lethal source of electrical power and an explosion hazard under certain conditions. Do not touch the connector posts. Do not lift the cabinet with batteries installed. WARNING Prior to connecting the batteries to the rectifier, ensure that all AC and DC circuit breakers are in the...
  • Page 24: Installing Data Cables

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Installing Data Cables This procedure assumes that required panels and covers are removed to facilitate the instal- lation of data wiring from local sources. For more information, refer to Emerson document 631-205-071.
  • Page 25: Metallic Cable

    Installation Metallic Cable Metallic cable has a metal sheath ground shield within the insulation. This ground shield must be connected to local ground to eliminate crosstalk and other interference on the line. When cutting outer insulation ensure cable pair insulation is not cut. NOTE The following information is generic in nature.
  • Page 26: Power Turn-Up

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Power Turn-up After power is available to the cabinet from a commercial power source and the cabinet has been wired for power in accordance with “Chapter 3, AC Power” in Emerson document 631- 205-071, the cabinet is ready for power turn-up.
  • Page 27: Turnup And Test Ecc

    Total Access 3000 Operation of the Total Access 3000 chassis centers on the installation of the SCU and the DS3 MUX modules. For more information, refer to the Total Access 3000/3010 Enhanced System Controller Unit Installation and Maintenance Practice (P/N 61181018L1-5).
  • Page 28: Table 8. Alarm Block Terminations

    Total Access 3000 Hi-Cap RT Solution Installation and Maintenance Manual Alarm inputs must be jumpered by the customer to customer-designated and Total Access 3000 input terminals. The customer has the option of determining jumper arrangement and connection preferences. See Table 8 for alarm block connections from each shelf unit backplane connector to alarm block wire-wrap termination.
  • Page 29: Customer Wiring

    Protector Block. A protection module is provided for the corresponding position in the Protector Block. After a cross connect has been completed, the HDSLx or appropriate technology module should then be seated in the Total Access 3000 chassis.
  • Page 30: Maintenance

    ADTRAN Customer and Product Service. If a fuse fails, replace it with the same type and rating as the failed fuse. ADTRAN does not recommend that repairs be attempted in the field. Repair services may be obtained by returning the defective unit to ADTRAN. Refer to ““Appendix A, Warranty”...
  • Page 31: Warranty

    Appendix A Warranty WARRANTY AND CUSTOMER SERVICE ADTRAN will replace or repair this product within the warranty period if it does not meet its published specifications or fails while in service. Warranty information can be found at www.adtran.com/warranty. Refer to the following subsections for sales, support, Customer and Product Service (CAPS) requests, or further information.
  • Page 32 ® Carrier Networks Division 901 Explorer Blvd. Huntsville, AL 35806...

This manual is also suitable for:

3000

Table of Contents