Setting Up The Unit On A Base Frame - Henny Penny FlexFusion FPE-615 Installation Manual

Electric platinum combi incl. grease collection
Hide thumbs Also See for FlexFusion FPE-615:
Table of Contents

Advertisement

5.4 Setting up the unit on a base frame

Prerequisite The base frame must carry the weight of the unit
CAUTION
f
e
d
Image: Setting up the unit on a base frame
a Lift fork
b Waste trap on the unit
c Base frame
Base frame levelled
Base frame must be set up in accordance with the planning drawing
1. Lift the unit.
2. Place the unit over the stud bolts and onto the base frame.
Risk of scalding due to spillage of hot cooked food
• Attach stickers if the upper insertion rails are higher than 1,6 m (5,3 ft).
Image: Attach warning sign regarding the shelf height
3. Clean the adhesion surface for the sticker.
4. Attach the sticker to the cooking chamber door at a height of 1,6 m
(5,3 ft).
Installation instructions
Installing the unit
c
b
a
d Stud bolt
e Unit leg
f Unit
19

Advertisement

Table of Contents
loading

Table of Contents