Putting the unit into service
Controls functioning?
Monitoring of cooking chamber door functioning?
Unit heated and rinsed?
Was the unit put into service?
Comments:
Operator trained?
Electrical installation was made by:
Company
The connection to a kitchen guiding system was made by:
Company
Water installation was made by:
Company
Wastewater installation was made by:
Company
Exhaust air connection was made by:
Company
Function check was made by:
Company
Operator was trained by:
48
Function check
Final notes
Installation fitter
Installation fitter
Installation fitter
Installation fitter
Installation fitter
Installation fitter
Installation instructions
Place, date
Place, date
Place, date
Place, date
Place, date
Place, date
Yes
No
Yes
No
Signature
Signature
Signature
Signature
Signature
Signature