IBM 5500 Operational, Installation, And Maintenance Manual page 70

Express ip control unit
Hide thumbs Also See for 5500:
Table of Contents

Advertisement

Chapter 5: Troubleshooting
The system is ready when the Ready LED is yellow and the Test LED
is off (not lighted). The unit is now operational and ready for initial
configuration as described in "Configuring the 5500 Express IP
Control Unit" on page 55.
70
Planning, Installation, and Maintenance Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

5500-01e5500-02e5500-01t5500-02t

Table of Contents