IBM 5500 Operational, Installation, And Maintenance Manual page 126

Express ip control unit
Hide thumbs Also See for 5500:
Table of Contents

Advertisement

126
Chapter 6: Twinax Client Cabling Requirements and Problem Solving
Socket 2
Phase A
Blue Cable
Socket 1
Phase B
Phase A
Red Cable
Phase B
Socket
Phase
A
1
2
B
B
A
Figure 61: Twinax Y
Use the following procedure to test the twinax Y:
1. Install a test connector on the IBM Cabling System connector of the Y as
shown in Figure 61.
2. Check for the resistances shown in Figure 62.
Planning, Installation, and Maintenance Guide
Red
Green
Orange
Black
Shield
Red Cable
Blue Cable
Cabling System
Connector
Red
Green
Orange
Black
55E1I037

Advertisement

Table of Contents
loading

This manual is also suitable for:

5500-01e5500-02e5500-01t5500-02t

Table of Contents