Agilent Technologies Helium G8610 Series Field Installation Instructions page 23

Ion source replacement for leak detection
Hide thumbs Also See for Helium G8610 Series:
Table of Contents

Advertisement

Vacuum Products Division
7. To remove the spectrometer top cover, it may be necessary to first pull straight out the
thermocouple gauge (shown in Figure 3-4 with the red arrow. It is shown without the outside black
plastic cover). Leave the thermocouple gauge connected to its wiring. Use an M3 Phillips head
screw driver to remove the four screws securing it. The screw shown in the top right of Figure 3-4
will be securing a grounding strap. Leave the ground strap hanging from the leak detector frame.
Disconnect the two electrical cables plugged into the spectrometer board, the pre-amp RJ45 style
connector on the turbo side of the spectrometer, and the ion source multi-pin connector (Cables
not shown for clarity: refer to Figure 3-5). Remove the top cover, set aside with the screws.
CAUTION
Manual 699910005, Hot Ion Source Replacement
Thermocouple
Gauge
Figure 3-4. Spectrometer access
Static sensitive device, ensure that personnel are properly grounded
before proceeding.
Page 18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Helium g8611 seriesHelium g8612 seriesHelium vs series

Table of Contents