Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System Reference - Intel R1000EP Series Service Manual

Hide thumbs Also See for R1000EP Series:
Table of Contents

Advertisement

Server System Features

2 Hardware Installations and Upgrades

Before You Begin

Before working with your server product, pay close attention to the "Safety Information" at the
beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all peripheral
devices and the power cord.

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)

System Reference

All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
®
Note: The Intel
Server System R1208EP2SHFN and R1304EP2SHFN
are shown for illustration purposes. Server components with the product family are identical.

Cable Routing

When you add or remove components from your server system, make sure your cables are routed
correctly before reinstalling the server system cover. Use caution to make sure no cables or wires
are pinched and that the airflow from the fans is not blocked. Use the figures below to determine
the correct cable routing.
Note: Red lines are for power connection, dot lines are for optional device connection.
12
®
Intel
Server System R1000EP Service Guide

Advertisement

Table of Contents
loading

Table of Contents