Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System Reference - Intel JBOD 2000 Service Manual

Storage server system
Hide thumbs Also See for JBOD 2000:
Table of Contents

Advertisement

2 Hardware Installations and Upgrades

Before You Begin

Before working with your server product, pay close attention to the
beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all peripheral
devices and the power cord.

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)

System Reference

All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
.Cable Routing
When you add or remove components from your JBOD, make sure your cables are routed
correctly before reinstalling the system cover. Use caution to make sure no cables or wires are
pinched and that the airflow from the fans is not blocked.

Fan Connections

Use the figures below to determine the proper fan connections.
®
Intel
JBOD2000 Family Service Guide
Hardware Installations and Upgrades
Figure 8. System Fan Order
"Safety Information"
at the
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jbod2224s2dpJbod2312s2sp

Table of Contents