Chapter 3: Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System References - Intel SR1695WB Service Manual

Table of Contents

Advertisement

3
Hardware Installations and Upgrades

Before You Begin

Before working with your server product, pay close attention to the
at the beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all
peripheral devices and the power cord.

Tools and Supplies Needed

Phillips* (cross head) screwdrivers (#1 bit and #2 bit)
Needle nosed pliers
Pen or pencil
Antistatic wrist strap and conductive foam pad (recommended)

System References

All references to the left, right, front, top, and bottom assume the reader is facing the front
of the server system as it would be positioned for normal operation.

Removing and Installing the System Cover

Removing the System Cover

You must operate the server system with the system cover in place to ensure proper
cooling. You must remove the top cover to add or replace components inside of the server.
None of the internal components are hot-swappable. Before you remove the server system
cover, power down the server and unplug all peripheral devices and the power cable.
Note: You may need a non-skid surface or a stop behind the server system to prevent the server
system from sliding on your work surface.
1. Remove the top cover screw (see letter "A").
2. Loosen the screw at the rear of the chassis (see letter "B").
3. Push rearward on the blue grip point at the front of the server.
®
Intel
Server System SR1695WB Service Guide
"Safety Information"
25

Advertisement

Table of Contents
loading

Table of Contents