Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System Reference - Intel R2000GL Service Manual

Hide thumbs Also See for R2000GL:
Table of Contents

Advertisement

2 Hardware Installations and Upgrades

Before You Begin

Before working with your server product, pay close attention to the
beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all peripheral
devices and the power cord.

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)

System Reference

All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
®
Note: The Intel
Server System R2216GZ is shown for illlustration purposes, server components with the
product family are identical.
®
Intel
Server Chassis P4000S Service Guide
Hardware Installations and Upgrades
"Safety Information"
at the
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

R2000gz

Table of Contents