Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System Reference - Intel H2000G Series Service Manual

Server chassis
Hide thumbs Also See for H2000G Series:
Table of Contents

Advertisement

2
Hardware Installations and
Upgrades

Before You Begin

Before working with your server product, pay close attention to the Safety
Information at the beginning of this manual.
Warning: The transparent plastic protective films on the chassis top surface must be
removed for proper system cooling.
Note: Whenever you service the server chassis, you must first power down the server
and unplug all peripheral devices and the AC power cord.

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)

System Reference

All references to left, right, front, top, and bottom assume that the reader is
facing the front of the chassis as it would be positioned for normal operation.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

H2312 kr2 seriesH2216 kr2 series

Table of Contents