Results Of Pv Test - Furuno FELCOM 15 Operator's Manual

Inmarsat-c mobile earth station
Hide thumbs Also See for FELCOM 15:
Table of Contents

Advertisement

8. MAINTENANCE
8.4.3

Results of PV test

1. At the standby display, press the function key [F7] to display the Options
menu.
2. Press the [6] key to display the Test menu.
3. Press the [2] key to display the results of the PV test.
4. To return to the standby display, press any key.
Interpreting the PV test results display
Test Date & Time:
Attempts:
BBER:
Shore-to-Ship Attempts: Number of tests initiated by LES.
Ship-to-Shore Attempts: Number of tests initiated by MES.
Distress Alert:
Signal Strength:
Overall Result:
8-6
Options
1. Login
2. Logout
1. PV Test
3. Abort
2. PV Test Result
4. Select NCS
3. Self Test
5. Ocean Region
4. Distress Alarm Button Test
6. Test
Test menu
Options
Test
1. Login
2. Logout
1. PV Test
3. Abort
2. PV Test Result
4. Select NCS
3. Self Test
5. Ocean Region
Test Date & Time
02-02-25 01:58 (UTC)
4. Distress Alarm Button Test
6. Test
Attempts
First attempt
BBER
Pass
Shore-to-Ship Attempts
First attempt
Ship-to Shore Attempts
First attempt
Distress Alert
Pass (Test OK)
Signal strength
Pass (Greater than Std level + 6dB)
Overall Result
Pass (Applicable tests pass)
Sample PV test results
Date and time of test
Number of times the PV test was conducted.
Bulletin Board Error Rate (%). "Pass" appears for no
error.
"Pass (Test OK)" appears for successful testing.
"Pass" appears if signal strength is greater than
standard level.
"Pass" appears for satisfactory completion of the
test.
Test
PV Test Result
Ctrl+P: print ESC: quit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents