Transport; Unpacking And Initial Preparation - Baxi POWER HT+ Series Installation And Service Manual

Gas fired floor-standing condensing boiler
Hide thumbs Also See for POWER HT+ Series:
Table of Contents

Advertisement

5 5 .4

Transport

Fig.24
Transport precautions
>45°
5.5

Unpacking and initial preparation

Fig.25
Unpacking
1
2
Fig.26
Preparation
3
7609474 - v02 - 04092014
Transport the pallet carrying the appliance using a pallet truck, a forklift
truck or a 4-wheel removals cart.
Do not use the top cover of the appliance for transport lifting.
Transport the appliance vertically.
Note
Have two people available.
Handle the appliance with gloves.
MW-3000015
1. Remove the cardboard packaging.
2. Remove the plastic protection and the polystyrene cover.
MW-3000016
3. Remove the front panel.
4. Remove the screws fixing the boiler to the pallet.
5. Take the condensate hose that you will find in the boiler and connect
it to the condensate discharge.
6. Put the boiler in its intended position.
4
Caution
x3
Moving the boiler is a job for two people.
7. Level the boiler using the adjustable feet.
MW-3000017
5 Before installation
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents