7 Commissioning
Fig.66
POWER HT+ 1.50 – POWER HT+
1.70
1
Fig.67
POWER HT+ 1.90 – POWER HT+
1.110
2
1
Tab.24 Checking and setting values for gas type G20
Diameter of the Venturi
Diameter of the nozzles
Minimum CO
2
(1)
Maximum CO
(1)
2
Maximum CO
(1) The CO
value is valid with the front panel mounted. If the front panel is removed (open chamber), the value readout is lower by 0.2%.
2
62
7 7 .4.4 Gas valves
1 Gas flow rate setting screw
2 OFFSET setting screw:
3 Gas supply pressure outlet
3
2
MW-3000045-01
1 Gas flow rate setting screw
2 OFFSET setting screw:
3 Sealed chamber pressure signal
4
4 Gas supply pressure outlet
Tab.23 Settings values for a new gas valve on POWER HT +
The settings screw is screwed down as far as it will go and is then is un
screwed according to the number of turns given in the following table.
Boiler model
3
POWER HT+ 1.50
POWER HT+ 1.70
POWER HT+ 1.90
POWER HT+ 1.110
7.4.5 CO
Unit
POWER HT+ 1.50
mm
24
mm
3.70 (no. 2)
%
8.5
%
9.0
ppm
< 250
Remove the plug
Use a 4 mm hexagonal spanner
Remove the plug
Use a flat-blade screwdriver
Nominal heating flow
rate:
Number of turns for the
gas flow rate settings
screw
12
13
2 + 2/3
2 + 1/3
checking and setting values
2
POWER HT+ 1.70
POWER HT+ 1.90
30
34
5.30 (no. 2)
5.60 (no. 2)
8.5
8.5
9.0
9.0
< 250
< 250
Minimum heating flow
rate:
Number of turns for the
OFFSET settings
screw
5 + 3/4
5 + 3/4
5 + 3/4
5 + 3/4
POWER HT+ 1.110
38
6.40 (no. 2)
9.0
9.2
< 250